Completed works across London and beyond

A selection of completed projects for local authorities and housing associations — passive fire protection, retrofit, installation and electrical works, delivered to accredited standards.

Case studies

Selected projects in depth

A closer look at how we deliver on complex, occupied and public-sector contracts.

Fire Safety

Kemp House, Soho

Westminster City Council

The challenge

A 17-storey occupied residential tower in Soho required its fire doors replaced across every floor, with asbestos present in parts of the building.

Our approach

We delivered a phased fire door replacement under BM TRADA Q-Mark, managing asbestos safely and working floor by floor to keep disruption to residents to a minimum.

The outcome

Certified fire doorsets installed throughout, with a full photographic and certification record compiled for the building safety file.

  • 17 storeys
  • All floors + communal areas
  • BM TRADA Q-Mark
  • Asbestos managed
  • Full certification pack
Fire Safety

Royal Borough of Kingston — Civic Buildings

Kingston upon Thames

The challenge

Fire door and compartmentation works across landmark, publicly-accessible civic buildings — including the Guildhall, Kingston Museum, libraries and community centres.

Our approach

We surveyed and upgraded fire doors and compartmentation across the estate to BM TRADA Q-Mark and FIRAS standards, scheduling works around public access and daily building use.

The outcome

Estate-wide fire safety upgrades delivered and certified, supporting the council's building compliance obligations across multiple sites.

  • Multiple civic buildings
  • BM TRADA & FIRAS
  • Occupied / public access
  • Phased programme
Fire stopping — service penetrations sealed with intumescent collars
Fire Safety

Fire stopping & compartmentation

Residential blocks, London

The challenge

Compartmentation in residential blocks had been compromised by unsealed service penetrations, undermining fire separation between floors and flats.

Our approach

We carried out a fire-stopping survey and sealed service penetrations, linear gaps and risers using tested, compatible systems and intumescent collars.

The outcome

Restored compartmentation with a full photographic record and certification for the building safety file.

  • Multi-floor blocks
  • Third-party tested systems
  • Intumescent collars
  • Photographic records
Retrofit

Stonewater — Internal Wall Insulation

Housing association homes

The challenge

Improve the thermal performance and EPC ratings of occupied solid-wall social housing, without creating moisture or condensation problems.

Our approach

Under the PAS 2030/2035 framework we installed BBA-certified internal wall insulation, coordinating ventilation alongside the fabric measures to manage moisture risk.

The outcome

Warmer, more efficient homes with improved EPC ratings, installed to certified detail and handed over with full records.

  • PAS 2030/2035
  • BBA-certified IWI
  • EPC uplift
  • Occupied homes
  • Moisture-safe design
Selected projects

Trusted on public-sector and housing contracts

Thirty projects spanning civic buildings, residential towers and housing estates. Filter by discipline below.

Fire Safety

Kemp House

Soho, Westminster City Council

Fire door replacement programme across a 17-storey residential tower — every floor plus communal areas — delivered with asbestos management and full installation certification.

BM TRADA Q-Mark · BS 8214
Fire Safety

Royal Borough of Kingston — Civic Buildings

Kingston upon Thames

Fire door and compartmentation works across landmark civic buildings including the Guildhall, Kingston Museum, Kingston Library, Sessions House and Market House.

BM TRADA Q-Mark · FIRAS
Fire Safety

Royal Borough of Kingston — Community Estate

Kingston upon Thames

Phased fire door upgrades across the Moor Lane Centre, New Malden and Surbiton libraries and a range of youth and community centres.

BM TRADA Q-Mark · FIRAS
Fire Safety

Metropolitan Thames Valley Housing (MTVH)

Greater London

Multi-year fire door installation and fire safety remedial programme across the association's London housing stock, with photographic compliance records.

BM TRADA Q-Mark · BS 8214
Fire Safety

The Guinness Partnership

Central & West London

Building safety remediation under an FRAEW-led framework, delivering certified passive fire protection to occupied residential blocks.

FIRAS · PAS 9980
Fire Safety

London Borough of Camden

Camden, London

Communal fire door upgrades, automated door closers and fire-resisting meter cupboard works across council residential blocks.

BM TRADA Q-Mark · BS 8214
Fire Safety

London Borough of Waltham Forest

Waltham Forest, London

Fire door installation programme with certified self-closing devices across residential blocks, individually labelled and certified.

BM TRADA Q-Mark · FIRAS
Fire Safety

Dufours Place

Soho, Westminster City Council

Communal and flat-entrance fire doorset replacement to a Soho residential block, installed and certified to standard.

BM TRADA Q-Mark · BS 8214
Fire Safety

Joseph Conrad House

Westminster City Council

Fire door installation and certification programme to communal areas, completed with a full compliance handover pack.

BM TRADA Q-Mark · BS 8214
Fire Safety

Parsons House

Westminster City Council

Replacement certified fire doorsets to communal areas of a residential tower, with installation certification issued.

BM TRADA Q-Mark · BS 8214
Fire Safety

Passive Fire Protection — London Blocks

Greater London

Fire stopping and compartmentation to communal risers and service penetrations across residential blocks, using tested, compatible systems.

FIRAS · third-party tested systems
Fire Safety

Samuel Lewis Trust Dwellings

Liverpool Road, Islington (N1)

Fire door installation to heritage mansion-block social housing on Liverpool Road, matching certified doorsets to a sensitive building fabric.

BM TRADA Q-Mark · BS 8214
Fire Safety

Stirling Grove — Social Housing

Hounslow, London

Flat-entrance and electrical-cupboard fire door replacement across multiple flats, each installed and certified.

BM TRADA Q-Mark · BS 8214
Fire Safety

East End Homes

Tower Hamlets, London

Fire safety and communal door works to housing association blocks, delivered with certification and resident liaison.

BM TRADA Q-Mark
Retrofit

Stonewater

England

Internal wall insulation (IWI) retrofit programme to housing association homes, improving thermal performance under the PAS framework.

PAS 2030/2035 · BBA-certified IWI
Retrofit

Two Rivers Housing

Gloucestershire

Fabric-first internal wall insulation programme raising EPC ratings across association homes, installed to certified detail.

PAS 2030/2035 · BBA-certified IWI
Retrofit

PA Housing

Greater London

Retrofit and internal wall insulation installs delivered under framework, with method statements and handover records.

PAS 2030/2035 · BBA-certified IWI
Retrofit

Sir Walter Raleigh Court

London

Internal wall insulation to residential block apartments, coordinated with ventilation provision to manage moisture risk.

PAS 2030/2035 · BBA-certified IWI
Retrofit

Bredgar House

Lewisham (SE13)

Retrofit insulation and energy-upgrade works to a residential block, surveyed and installed to framework standards.

PAS 2030/2035
Retrofit

Greenwich Wharf

Greenwich, London

Internal wall insulation and fabric upgrade works, delivered with pre-install survey and certified systems.

PAS 2030/2035 · BBA-certified IWI
Retrofit

ECO Energy Programme

Maida Vale & Bayswater, Westminster

Domestic energy-efficiency upgrades across Crawford Mansions, Gloucester Terrace, Kildare Gardens and Blomfield Crescent under ECO funding.

ECO · PAS 2030/2035
Retrofit

Domestic EPC Programme

West Drayton & Yiewsley

Rolling domestic EPC assessment programme across Otter Way and Autumn Way, supporting improvement plans and measure specification.

RdSAP · EPC lodgement
Installation

London Borough of Lewisham

Lewisham, London

Phase 2 glazing and window replacement across Allwood House and the Hazel Grove blocks, including mastic and staircase works.

FENSA · Building Regs
Installation

Queens Park Window Replacement

Westminster City Council

Conservation-area window replacement programme, installed to match heritage detailing and self-certified for compliance.

FENSA · Building Regs
Installation

Westbourne Primary School

London

Building services and compliance works to an occupied education setting, coordinated around the school calendar.

Building Regs · commissioned & certified
Installation

Kingston Guildhall — Fire-Rated Screens

Kingston upon Thames

Fabrication and installation of partition doorsets and glazed screens within a civic building, set out to dimensioned drawings.

Certified doorsets · BS 8214
Electrical

London Borough of Hackney

Hackney, London

Estate-wide communal and emergency lighting upgrade (Phases I & II) across the Acton, Boxmoor, Dorset, Joseph Court, Locknor and Mansfield estates.

NICEIC · BS 7671 · BS 5266
Electrical

Westminster City Council — Pimlico EML

Lillington Gardens, Westminster

Emergency lighting programme across Pimlico estate blocks including Longleat, Regency, Repton, Sheridan and Thorndike House.

NICEIC · BS 5266
Electrical

Fairchild House

Westminster City Council

Emergency lighting installation with FP200 fire-rated wiring, commissioned, certified and supplied with a maintenance log book.

NICEIC · BS 5266 · BS 7671
Electrical

Optivo

South East England

Gas and electrical compliance and remedial works across housing association homes, certified and notified to standard.

NICEIC · BS 7671
Your project next

Have a project or compliance requirement?

Tell us what you need and we'll come back with a clear, costed proposal.